As promised, I have shuffled the project groups, keeping at least two members in each Lab group but changing the subsystem. The new group and project assignments are below. Your job is to view the project website of the previous subsystem design and complete whatever tasks are left to finish it. . Your goal is to integrate that design with the others into a working whole. You have 2 weeks to accomplish this task, with final in-class demonstration to occur Tuesday December 12, 2006.
Lab A | Lab B | Lab C |
Group A1:
Master program
|
Group B1: Right-hand mechanism
|
Group C1: Left-arm positioning
|
Group A2: Left-hand interface
|
Group B2: Pickup
|
Group C2: Left-hand mechanism
|
Group A3: Right-hand interface
|